IH 45 NB EXIT RAMP over UPRR

0.20 MI S OF SH 31 · County 349, Texas · Built 2003 · 1 Lanes · 13,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
181750009206375
Year Built
2003
Length
111.9 m (367.1 ft)
Max Span
24.1 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
13,950
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,000
Total Project Cost
$23,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.