IH 45 NBML over UPRR
0.2 MI S OF SH 31 · County 349, Texas · Built 2003 · 3 Lanes · 21,299 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.095114, -96.440356
This bridge is in worse condition than 28.4% of bridges in County 349. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
IH 45 NB EXIT RAMP over UPRR
Built 2003
IH 45 SBML over UPRR
Built 2003
IH 45 NB over SH 31
Built 1964
IH 45 SB over SH 31
Built 1964
IH 45 EFR/CR SE 20 over MESQUITE CREEK
Built 1964
IH 45 NBFR over POST OAK CREEK
Built 2000
IH 45 NB over POST OAK CREEK
Built 1964
IH 45 SB over POST OAK CREEK
Built 1964
IH 45 SBFR over POST OAK CREEK
Built 2000
IH 45 NB ML over MESQUITE CRK
Built 1964
Bridge Details
- Structure #
- 181750009206374
- Year Built
- 2003
- Reconstructed
- 2018
- Length
- 111.9 m (367.1 ft)
- Max Span
- 24.1 m
- Width
- 17.5 m (57.4 ft)
- Lanes
- 3
- Daily Traffic
- 21,299
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.