Marshall Creek Rd over UP Railroad

0.05 Mi W of US 377 · County 121, Texas · Built 2013 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610R00035002
Year Built
2013
Length
289.3 m (949.1 ft)
Max Span
32.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.