SH 114 EBML over US 377 & UPRR

0.5 MI W of US 377 · County 121, Texas · Built 2023 · 3 Lanes · 55,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180610008109332
Year Built
2023
Length
720.5 m (2363.8 ft)
Max Span
73.2 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
55,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.