SH 114 WB over UP RAILROAD
3.0 MI E OF IH 35W · County 121, Texas · Built 1999 · 2 Lanes · 12,400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.012008, -97.221508
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
SH 114 EB over UP RAILROAD
Built 1999
SH 114 EBML over US 377 & UPRR
Built 2023
SH 114 BUS over CADE CRK
Built 1930
SH114 Off-ramp over UPRR
Built 2023
Marshall Creek Rd over UP Railroad
Built 2013
SH 114 EB Ramp over R.O.W
Built 2023
Al Slaughter Pkwy over Cade Branch Trib
Built 2008
Blythe Bridge Dr over Cade Branch
Built 2009
LOIS ST. over SH 114
Built 1999
US 377 over SH 114 BUSINESS
Built 2021
Bridge Details
- Structure #
- 180610035302180
- Year Built
- 1999
- Length
- 402.3 m (1319.9 ft)
- Max Span
- 36.6 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 12,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.