SH 114 EB Ramp over R.O.W

0.5 MI W of US 377 · County 121, Texas · Built 2023 · 1 Lanes · 5,575 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180610035309530
Year Built
2023
Length
110 m (360.9 ft)
Max Span
36.9 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
5,575
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.