PAIGE ROAD over OFFICE CREEK
0.25 MI N OF SH 121 · County 121, Texas · Built 2003 · 7 Lanes · 18,271 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
33.075481, -96.876503
This bridge is in worse condition than 96% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
SRT SBML over PLANO PKWY / PAIGE RD
Built 2009
SH 121 over DRAIN
Built 2006
SRT NBML over PLANO PKWY / PAIGE RD
Built 2009
SH 121 over DRAIN
Built 2007
MEMORIAL DR over OFFICE CREEK
Built 2005
Colony Blvd W CONN over SH 121 SB On-Ramp
Built 2015
BLAIR OAKS DR over OFFICE CREEK
Built 2005
S Colony Blvd over SH 121
Built 2016
Colony Blvd E CONN over SH 121 NB Exit Ramp
Built 2015
Colony Blvd N CONN over SH 121 SB On-Ramp
Built 2015
Bridge Details
- Structure #
- 180610MM0245002
- Year Built
- 2003
- Length
- 14.9 m (48.9 ft)
- Max Span
- 2.4 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 7
- Daily Traffic
- 18,271
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.