SH 121 over DRAIN
1.20 MI NE OF FM 423 · County 121, Texas · Built 2007 · 14 Lanes · 76,750 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.073742, -96.8718
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
SH 121 over DRAIN
Built 2006
SRT SBML over PLANO PKWY / PAIGE RD
Built 2009
SRT NBML over PLANO PKWY / PAIGE RD
Built 2009
PAIGE ROAD over OFFICE CREEK
Built 2003
Colony Blvd W CONN over SH 121 SB On-Ramp
Built 2015
S Colony Blvd over SH 121
Built 2016
Colony Blvd E CONN over SH 121 NB Exit Ramp
Built 2015
Grandscape Blvd over Nebraska Furniture Mart
Built 2015
Colony Blvd N CONN over SH 121 SB On-Ramp
Built 2015
MEMORIAL DR over OFFICE CREEK
Built 2005
Bridge Details
- Structure #
- 180610036403175
- Year Built
- 2007
- Reconstructed
- 2015
- Length
- 10.4 m (34.1 ft)
- Max Span
- 3 m
- Lanes
- 14
- Daily Traffic
- 76,750
- Material
- Concrete
- Design
- Culvert
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.