SH 121 over DRAIN

1.20 MI NE OF FM 423 · County 121, Texas · Built 2007 · 14 Lanes · 76,750 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180610036403175
Year Built
2007
Reconstructed
2015
Length
10.4 m (34.1 ft)
Max Span
3 m
Lanes
14
Daily Traffic
76,750
Material
Concrete
Design
Culvert
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.