SH 121 over DRAIN
0.80 MI NE OF FM 423 · County 121, Texas · Built 2006 · 16 Lanes · 76,750 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.071706, -96.87615
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 20 years old.
Nearby Bridges
SRT SBML over PLANO PKWY / PAIGE RD
Built 2009
SRT NBML over PLANO PKWY / PAIGE RD
Built 2009
PAIGE ROAD over OFFICE CREEK
Built 2003
SH 121 over DRAIN
Built 2007
MEMORIAL DR over OFFICE CREEK
Built 2005
BLAIR OAKS DR over OFFICE CREEK
Built 2005
SH 121 over DRAIN
Built 2006
Colony Blvd W CONN over SH 121 SB On-Ramp
Built 2015
S Colony Blvd over SH 121
Built 2016
Colony Blvd E CONN over SH 121 NB Exit Ramp
Built 2015
Bridge Details
- Structure #
- 180610036403174
- Year Built
- 2006
- Length
- 10.7 m (35.1 ft)
- Max Span
- 2.4 m
- Lanes
- 16
- Daily Traffic
- 76,750
- Material
- Concrete
- Design
- Culvert
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.