Colony Blvd E CONN over SH 121 NB Exit Ramp

0.02 MI NE of S COLONY · County 121, Texas · Built 2015 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610036403693
Year Built
2015
Length
43 m (141.1 ft)
Max Span
25.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.