FM 2499(St School) over Trib Pecan Creek
0.4 MI S OF IH 35E · County 121, Texas · Built 2018 · 6 Lanes · 20,004 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.167939, -97.090825
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
IH 35E ML over MAYHILL RD
Built 1960
Clubhouse Dr over Trib Pecan Creek
Built 2007
Loon Lake Rd over Trib Pecan Creek
Built 2000
Edwards Rd over Draw
Built 2002
Mayhill Rd over Draw
Built 1970
IH 35E over BRINKER RD
Built 2019
POST OAK DR over IH 35E
Built 2017
Lakeview Blvd over Trib Pecan Creek
Built 2000
PINE HILLS LN over TRIB OF HICKORY CR
Built 2000
IH 35E over Loop 288
Built 2019
Bridge Details
- Structure #
- 180610268101105
- Year Built
- 2018
- Length
- 21.3 m (69.9 ft)
- Max Span
- 3 m
- Lanes
- 6
- Daily Traffic
- 20,004
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.