IH 35E over BRINKER RD
0.6 MI SE OF LOOP 288 · County 121, Texas · Built 2019 · 6 Lanes · 39,097 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.181147, -97.10065
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
Loon Lake Rd over Trib Pecan Creek
Built 2000
IH 35E over Loop 288
Built 2019
Clubhouse Dr over Trib Pecan Creek
Built 2007
IH 35E NBML over US 77 SB
Built 1958
IH 35E ML over MAYHILL RD
Built 1960
Mayhill Rd over Draw
Built 1970
Spencer Rd over Drain
Built 2004
FM 2499(St School) over Trib Pecan Creek
Built 2018
Edwards Rd over Draw
Built 2002
COLORADO BLVD over TRIB OF PECAN CR
Built 1991
Bridge Details
- Structure #
- 180610019601525
- Year Built
- 2019
- Length
- 109.7 m (359.9 ft)
- Max Span
- 36.6 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 39,097
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.