IH 35E over Loop 288
0.6 MI SE OF US 77 · County 121, Texas · Built 2019 · 6 Lanes · 45,272 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.186308, -97.107475
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
IH 35E NBML over US 77 SB
Built 1958
IH 35E over BRINKER RD
Built 2019
COLORADO BLVD over TRIB OF PECAN CR
Built 1991
Spencer Rd over Drain
Built 2004
Loon Lake Rd over Trib Pecan Creek
Built 2000
Spencer Rd over Trib Pecan Creek
Built 2004
Clubhouse Dr over Trib Pecan Creek
Built 2007
IH 35E over FM 2181
Built 1995
US 77 (DALLAS DR) over DRAIN
Built 1994
Mayhill Rd over Draw
Built 1970
Bridge Details
- Structure #
- 180610019601526
- Year Built
- 2019
- Length
- 108.8 m (357 ft)
- Max Span
- 36.3 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 45,272
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.