IH 35E over FM 2181
0.90 MI SE OF US 377 · County 121, Texas · Built 1995 · 4 Lanes · 96,065 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.19355, -97.12415
This bridge is in worse condition than 76% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 31 years old.
Nearby Bridges
US 77 (DALLAS DR) over DRAIN
Built 1994
IH 35E NBFR over UP RAILROAD
Built 1958
IH 35E NB over UP RAILROAD
Built 2004
IH 35E SB over UP RAILROAD
Built 2001
IH 35E SBFR over UP RAILROAD
Built 1958
COLORADO BLVD over TRIB OF PECAN CR
Built 1991
Spencer Rd over Trib Pecan Creek
Built 2004
IH 35E NB over US 377
Built 2004
IH 35E SB over US 377
Built 2004
MORSE ST over TRIB OF PECAN CR
Built 2008
Bridge Details
- Structure #
- 180610019503137
- Year Built
- 1995
- Length
- 77.7 m (254.9 ft)
- Max Span
- 25.9 m
- Width
- 36 m (118.1 ft)
- Lanes
- 4
- Daily Traffic
- 96,065
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.