US 77 (DALLAS DR) over DRAIN
0.75 MI NW OF IH 35E · County 121, Texas · Built 1994 · 4 Lanes · 23,046 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.199197, -97.123978
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 32 years old.
Nearby Bridges
IH 35E over FM 2181
Built 1995
Lakey St over Trib Pecan Creek
Built 1999
MORSE ST over TRIB OF PECAN CR
Built 2008
S Bradshaw St over Trib Pecan Creek
Built 1999
COLORADO BLVD over TRIB OF PECAN CR
Built 1991
Skinner St over Trib Pecan Creek
Built 1999
IH 35E NBFR over UP RAILROAD
Built 1958
IH 35E NB over UP RAILROAD
Built 2004
IH 35E SB over UP RAILROAD
Built 2001
IH 35E SBFR over UP RAILROAD
Built 1958
Bridge Details
- Structure #
- 180610019601285
- Year Built
- 1994
- Length
- 7.8 m (25.6 ft)
- Max Span
- 2.1 m
- Width
- 38.4 m (126 ft)
- Lanes
- 4
- Daily Traffic
- 23,046
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.