POST OAK DR over IH 35E
2.6 MI SE OF LP 288 · County 121, Texas · Built 2017 · 8 Lanes · 11,100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.162003, -97.073439
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 9 years old.
Nearby Bridges
Lakeview Blvd over Trib Pecan Creek
Built 2000
Burr Oak Dr over Trib Pecan Creek
Built 2018
IH-35E over CORINTH PARKWAY
Built 2017
FM 2499(St School) over Trib Pecan Creek
Built 2018
Edwards Rd over Draw
Built 2002
IH 35E ML over MAYHILL RD
Built 1960
Edwards Rd over Draw
Built 2012
IH 35E over Lynchburg Creek
Built 2023
PINE HILLS LN over TRIB OF HICKORY CR
Built 2000
Mayhill Rd over Draw
Built 1970
Bridge Details
- Structure #
- 180610019601514
- Year Built
- 2017
- Length
- 80.2 m (263.1 ft)
- Max Span
- 40.1 m
- Width
- 36.3 m (119.1 ft)
- Lanes
- 8
- Daily Traffic
- 11,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.