VIA DEL NORTE NB over DRAIN
0.05 MI S OF GREEN CANYON · County 113, Texas · Built 2005 · 2 Lanes · 300 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.816967, -96.607258
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
GREEN CANYON DR over NORTH MESQUITE CREEK
Built 1980
VIA DEL NORTE over NORTH MESQUITE CREEK
Built 2005
TOWN EAST BLVD over NORTH MESQUITE CREEK
Built 1988
N GALLOWAY AVE over DRAINAGE DITCH
Built 1980
AMERICANA DR over DRAINAGE DITCH
Built 1981
Hollow Bend over Drainage Ditch
Built 1984
Northwest Dr. SB over IH 30
Built 1999
Northwest Dr. NB over IH 30
Built 1999
IH 635 ML & NB FR over DRAINAGE DITCH
Built 2022
North Galloway Ave over IH-30
Built 2021
Bridge Details
- Structure #
- 180570C03050002
- Year Built
- 2005
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.