Northwest Dr. SB over IH 30
1.1 Mi. NE of IH 635 · County 113, Texas · Built 1999 · 4 Lanes · 10,706 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.832719, -96.612572
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
Northwest Dr. NB over IH 30
Built 1999
IH 30 WB ML & FR over Duck Creek Relief
Built 1999
IH 30 WB ML & FR over Duck Creek
Built 1999
IH 30 EB ML & FR over Duck Creek Relief
Built 1999
IH 30 EB ML & FR over Duck Creek
Built 1999
NORTHWEST DR over LONG BRANCH
Built 1971
North Galloway Ave over IH-30
Built 2021
OATES DRIVE WB over LONG BRANCH CREEK
Built 1986
OATES DRIVE EB over LONG BRANCH CREEK
Built 1986
BELT LINE RD NB over DUCK CREEK
Built 1976
Bridge Details
- Structure #
- 180570000911042
- Year Built
- 1999
- Length
- 63.4 m (208 ft)
- Max Span
- 36 m
- Width
- 21 m (68.9 ft)
- Lanes
- 4
- Daily Traffic
- 10,706
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.