IH 30 EB ML & FR over Duck Creek Relief

1.7 Mi. NE of IH 635 · County 113, Texas · Built 1999 · 6 Lanes · 74,801 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570000911454
Year Built
1999
Length
82.3 m (270 ft)
Max Span
27.4 m
Width
33 m (108.3 ft)
Lanes
6
Daily Traffic
74,801
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.