GREEN CANYON DR over NORTH MESQUITE CREEK
0.3 MI E OF N GALLOWAY · County 113, Texas · Built 1980 · 2 Lanes · 1,849 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.816972, -96.607828
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
VIA DEL NORTE NB over DRAIN
Built 2005
VIA DEL NORTE over NORTH MESQUITE CREEK
Built 2005
TOWN EAST BLVD over NORTH MESQUITE CREEK
Built 1988
N GALLOWAY AVE over DRAINAGE DITCH
Built 1980
AMERICANA DR over DRAINAGE DITCH
Built 1981
Hollow Bend over Drainage Ditch
Built 1984
Northwest Dr. SB over IH 30
Built 1999
Northwest Dr. NB over IH 30
Built 1999
IH 635 ML & NB FR over DRAINAGE DITCH
Built 2022
I635 NB/I30 EB DC over I-30 EBFR
Built 2024
Bridge Details
- Structure #
- 180570C01200001
- Year Built
- 1980
- Reconstructed
- 2005
- Length
- 17.7 m (58.1 ft)
- Max Span
- 2.4 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 1,849
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.