N GALLOWAY AVE over DRAINAGE DITCH
0.9 MI N OF US 80 · County 113, Texas · Built 1980 · 6 Lanes · 22,131 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.805939, -96.611206
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
AMERICANA DR over DRAINAGE DITCH
Built 1981
Hollow Bend over Drainage Ditch
Built 1984
TOWN EAST BLVD over NORTH MESQUITE CREEK
Built 1988
BROOKHAVEN DR over DRAINAGE DITCH
Built 1990
VIA DEL NORTE over NORTH MESQUITE CREEK
Built 2005
GREEN CANYON DR over NORTH MESQUITE CREEK
Built 1980
VIA DEL NORTE NB over DRAIN
Built 2005
TOWNE CENTRE DR WB over IH 635
Built 2004
IH 635 SBFR over DRAINAGE DITCH
Built 1971
GALLOWAY AVE over US 80
Built 1955
Bridge Details
- Structure #
- 180570C01120001
- Year Built
- 1980
- Length
- 11.3 m (37.1 ft)
- Max Span
- 3.7 m
- Width
- 30.5 m (100.1 ft)
- Lanes
- 6
- Daily Traffic
- 22,131
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.