GALLOWAY AVE over US 80
0.80 MI E OF IH 635 · County 113, Texas · Built 1955 · 7 Lanes · 15,475 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.792525, -96.612083
This bridge is in worse condition than 91.2% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 71 years old.
Nearby Bridges
US 80 over DRAW
Built 1971
Hollow Bend over Drainage Ditch
Built 1984
BROOKHAVEN DR over DRAINAGE DITCH
Built 1990
US 80 WB over IH 635
Built 1971
US 80 WBFR over IH 635
Built 1971
IH 635 CONN D over IH 635/US 80
Built 1971
IH 635 CONN C over IH 635/US 80
Built 1971
US 80 EBFR over IH 635
Built 1971
US 80 CONN A over US 80
Built 1971
US 80 EB over IH 635
Built 1971
Bridge Details
- Structure #
- 180570009502085
- Year Built
- 1955
- Reconstructed
- 1964
- Length
- 57.9 m (190 ft)
- Max Span
- 16.8 m
- Width
- 27.2 m (89.2 ft)
- Lanes
- 7
- Daily Traffic
- 15,475
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $529,000
- Total Project Cost
- $661,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.