TI ACCESS RD over IH 635
0.4 MI E OF US 75 · County 113, Texas · Built 2005 · 7 Lanes · 9,920 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.924147, -96.757358
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
IH635/US75 RAMP WN over IH 635/US 75 INTERCHANGE
Built 2003
IH 635 WBFR over COTTONWOOD CREEK
Built 2005
HOV T-RAMP over IH 635 WB
Built 2005
IH 635 EBFR over COTTONWOOD CREEK
Built 2005
IH635/US75 RAMP SE over IH 635/US 75 INTERCHANGE
Built 2005
US 75 NB FR over COTTONWOOD CREEK
Built 2004
US 75 NB over COTTONWOOD CREEK
Built 2005
IH 635 WBFR over US 75
Built 2005
US 75 SB over COTTONWOOD CREEK
Built 2005
IH635/US75 RAMP NE over IH 635/US 75 INTERCHANGE
Built 2005
Bridge Details
- Structure #
- 180570237401464
- Year Built
- 2005
- Length
- 95.3 m (312.7 ft)
- Max Span
- 38 m
- Width
- 44.2 m (145 ft)
- Lanes
- 7
- Daily Traffic
- 9,920
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.