US 75 NB FR over COTTONWOOD CREEK

0.3 MI NE OF IH 635 · County 113, Texas · Built 2004 · 3 Lanes · 12,917 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570004707490
Year Built
2004
Length
86.6 m (284.1 ft)
Max Span
29.3 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
12,917
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,000
Total Project Cost
$28,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.