US 75 SB FR over COTTONWOOD CREEK
0.3 MI NE OF IH 635 · County 113, Texas · Built 2004 · 3 Lanes · 13,623 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.929339, -96.75985
This bridge is in worse condition than 91.2% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 22 years old.
Nearby Bridges
US 75 SB over COTTONWOOD CREEK
Built 2005
US 75 NB over COTTONWOOD CREEK
Built 2005
US 75 NB FR over COTTONWOOD CREEK
Built 2004
IH635/US75 RAMP WN over IH 635/US 75 INTERCHANGE
Built 2003
IH 635 WBFR over COTTONWOOD CREEK
Built 2005
SB HOV WISH over US 75 SBML
Built 2005
IH 635 WBFR over US 75
Built 2005
NB HOV WISH over US 75 NBML
Built 2005
IH635/US75 RAMP SE over IH 635/US 75 INTERCHANGE
Built 2005
TI ACCESS RD over IH 635
Built 2005
Bridge Details
- Structure #
- 180570004707491
- Year Built
- 2004
- Length
- 75.9 m (249 ft)
- Max Span
- 25.6 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 3
- Daily Traffic
- 13,623
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $19,000
- Total Project Cost
- $24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.