IH 635 WBFR over COTTONWOOD CREEK

HIGH FIVE INTERCHANGE · County 113, Texas · Built 2005 · 4 Lanes · 7,281 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570237401463
Year Built
2005
Length
51.2 m (168 ft)
Max Span
26.8 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
7,281
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.