IH 635 EBFR over COTTONWOOD CREEK
HIGH FIVE INTERCHANGE · County 113, Texas · Built 2005 · 4 Lanes · 4,879 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.923417, -96.762511
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
IH635/US75 RAMP NE over IH 635/US 75 INTERCHANGE
Built 2005
IH635/US75 RAMP SE over IH 635/US 75 INTERCHANGE
Built 2005
IH 635 HOV over US 75 & CW CREEK
Built 2005
IH 635 WBML over US 75 AND CW CREEK
Built 2005
IH 635 EBFR over US 75
Built 2005
IH635 HOV FLYOVER over IH 635/US 75 INTERCHANGE
Built 2005
IH 635 EBML over US 75 AND CW CREEK
Built 2005
IH 635 WBFR over US 75
Built 2005
IH635/US75 RAMP WS over IH 635/US 75 INTERCHANGE
Built 2003
IH 635 WBFR over COTTONWOOD CREEK
Built 2005
Bridge Details
- Structure #
- 180570237401462
- Year Built
- 2005
- Length
- 60.2 m (197.5 ft)
- Max Span
- 28.7 m
- Width
- 18.7 m (61.4 ft)
- Lanes
- 4
- Daily Traffic
- 4,879
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,000
- Total Project Cost
- $25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.