SH 114 EB ML/FR/RP over DRAIN

0.2 MI NW of Spur 482 · County 113, Texas · Built 2021 · 8 Lanes · 42,502 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180570035306527
Year Built
2021
Length
18.4 m (60.4 ft)
Max Span
2.4 m
Lanes
8
Daily Traffic
42,502
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.