MARYLAND DRIVE SB over SH 183

0.2 MI W OF SH 114 · County 113, Texas · Built 2023 · 3 Lanes · 730 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
180570009407355
Year Built
2023
Length
122.8 m (402.9 ft)
Max Span
37.2 m
Width
9.1 m (29.9 ft)
Lanes
3
Daily Traffic
730
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.