SH 114 WB over SPUR 482

.60 MI SE of LP 12 · County 113, Texas · Built 2022 · 2 Lanes · 68,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570035306519
Year Built
2022
Length
118.9 m (390.1 ft)
Max Span
27.4 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
68,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.