SH 114 HOV Lanes over DRAIN

0.2 MI NW of Spur 482 · County 113, Texas · Built 2024 · 2 Lanes · 21,252 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180570035306525
Year Built
2024
Length
25.7 m (84.3 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
21,252
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.