DALLAS N TOLLWAY over CHAPEL HILL RD

0.5 MI N OF W PARK BLVD · County 085, Texas · Built 1991 · 9 Lanes · 203,320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430C01040003
Year Built
1991
Reconstructed
2016
Length
71 m (232.9 ft)
Max Span
26.5 m
Width
43.6 m (143 ft)
Lanes
9
Daily Traffic
203,320
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.