DALLAS N TOLLWAY over CHAPEL HILL RD
0.5 MI N OF W PARK BLVD · County 085, Texas · Built 1991 · 9 Lanes · 203,320 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.035142, -96.829425
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 35 years old.
Nearby Bridges
DALLAS N TOLLWAY over W PARK BLVD
Built 1991
DALLAS N TOLLWAY over WHITE ROCK CREEK TRIB
Built 1985
DALLAS N TOLLWAY over W PARKER RD
Built 1991
MIDWAY RD over DRAW
Built 1985
MIDWAY RD over INDIAN CREEK TRIBUTARY
Built 1985
W PARKER RD over WHITE ROCK CREEK TRIB
Built 1989
DNT Entrance Ramp over DNT SB Exit Ramp
Built 2019
DNT NB Exit Ramp over DNT NB Entrance Ramp
Built 2019
W PARK BLVD over WHITE ROCK CREEK
Built 1985
COLUMBINE DR over INDIAN CREEK TRIBUTARY
Built 1986
Bridge Details
- Structure #
- 180430C01040003
- Year Built
- 1991
- Reconstructed
- 2016
- Length
- 71 m (232.9 ft)
- Max Span
- 26.5 m
- Width
- 43.6 m (143 ft)
- Lanes
- 9
- Daily Traffic
- 203,320
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.