DALLAS N TOLLWAY over WHITE ROCK CREEK TRIB
0.1 MI S OF W PARK BLVD · County 085, Texas · Built 1985 · 19 Lanes · 203,320 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.026267, -96.829558
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 41 years old.
Nearby Bridges
DALLAS N TOLLWAY over W PARK BLVD
Built 1991
DNT Entrance Ramp over DNT SB Exit Ramp
Built 2019
DNT NB Exit Ramp over DNT NB Entrance Ramp
Built 2019
DALLAS N TOLLWAY over CHAPEL HILL RD
Built 1991
BALCONES DR over WHITE ROCK CREEK TRIB
Built 1982
WB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
EB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
WAYFARER DR over WHITE ROCK CREEK TRIB
Built 1982
SH 190 CONN C over DNT SB FR
Built 1998
SH 190 CONN J over DALLAS N TOLLWAY NB FR
Built 1998
Bridge Details
- Structure #
- 180430C01040001
- Year Built
- 1985
- Reconstructed
- 2004
- Length
- 7.9 m (25.9 ft)
- Max Span
- 2.7 m
- Lanes
- 19
- Daily Traffic
- 203,320
- Material
- Concrete
- Design
- Culvert
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.