DNT Entrance Ramp over DNT SB Exit Ramp
0.5 Mi N of PGB Turnpike · County 085, Texas · Built 2019 · 1 Lanes · 10,303 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.021428, -96.829839
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
DNT NB Exit Ramp over DNT NB Entrance Ramp
Built 2019
DALLAS N TOLLWAY over WHITE ROCK CREEK TRIB
Built 1985
WB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
EB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
DALLAS N TOLLWAY over W PARK BLVD
Built 1991
BALCONES DR over WHITE ROCK CREEK TRIB
Built 1982
SH 190 CONN C over DNT SB FR
Built 1998
SH 190 CONN J over DALLAS N TOLLWAY NB FR
Built 1998
SH 190 CONN I over DALLAS N TOLL CONN B D
Built 1998
SH 190 WB over DALLAS NORTH TOLLWAY
Built 1998
Bridge Details
- Structure #
- 180430C01040020
- Year Built
- 2019
- Length
- 167.6 m (549.9 ft)
- Max Span
- 33.5 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 10,303
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.