DNT NB Exit Ramp over DNT NB Entrance Ramp

0.4 Mi N of PGB Turnpike · County 085, Texas · Built 2019 · 1 Lanes · 10,205 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430C01040021
Year Built
2019
Length
131.7 m (432.1 ft)
Max Span
32.9 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
10,205
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.