DNT NB Exit Ramp over DNT NB Entrance Ramp
0.4 Mi N of PGB Turnpike · County 085, Texas · Built 2019 · 1 Lanes · 10,205 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.019886, -96.829036
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
DNT Entrance Ramp over DNT SB Exit Ramp
Built 2019
WB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
EB PLANO PKWY over DALLAS NORTH TOLLWAY
Built 1991
BALCONES DR over WHITE ROCK CREEK TRIB
Built 1982
SH 190 CONN C over DNT SB FR
Built 1998
DALLAS N TOLLWAY over WHITE ROCK CREEK TRIB
Built 1985
SH 190 CONN J over DALLAS N TOLLWAY NB FR
Built 1998
SH 190 CONN I over DALLAS N TOLL CONN B D
Built 1998
SH 190 WB over DALLAS NORTH TOLLWAY
Built 1998
SH 190 CONN B over DNT @ SH 190
Built 1998
Bridge Details
- Structure #
- 180430C01040021
- Year Built
- 2019
- Length
- 131.7 m (432.1 ft)
- Max Span
- 32.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 10,205
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.