SAM BASS RD over DRY FORK DRAW
0.70 MI N OF FM 1431 · County 491, Texas · Built 2002 · 4 Lanes · 6,765 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.553606, -97.76595
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 24 years old.
Nearby Bridges
E NEW HOPE DR over DRAINAGE DITCH
Built 2018
SAM BASS RD over DRY FORK DRAW
Built 2002
E NEW HOPE DR over DRY FORK CREEK
Built 2018
FM 1431 over BRANCH OF HONEY BEAR
Built 1986
FM 1431 over HONEY BEAR CREEK
Built 1986
E NEW HOPE DR over DRAW
Built 2005
Echo Park Dr over Draw
Built 2016
Pecan Creek Dr over Draw
Built 2015
Journey Pkwy over Draw
Built 2013
Krienke Ranch Rd over Brushy Creek
Built 2021
Bridge Details
- Structure #
- 142460AA0654002
- Year Built
- 2002
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.3 m
- Width
- 30.8 m (101 ft)
- Lanes
- 4
- Daily Traffic
- 6,765
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.