FM 1431 over HONEY BEAR CREEK
0.35 MI E OF SAM BASS RD · County 491, Texas · Built 1986 · 5 Lanes · 40,741 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.545678, -97.754397
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
FM 1431 over BRANCH OF HONEY BEAR
Built 1986
SAM BASS RD over DRY FORK DRAW
Built 2002
E NEW HOPE DR over DRAINAGE DITCH
Built 2018
SAM BASS RD over DRY FORK DRAW
Built 2002
E NEW HOPE DR over DRY FORK CREEK
Built 2018
E NEW HOPE DR over DRAW
Built 2005
MAYFIELD RANCH BLV over DRAW
Built 2014
WALH HILL TRL over BRUSHY CREEK TRIBUTARY
Built 2009
N FRONTIER LN over BRUSHY CREEK TRIBUTARY
Built 2012
Krienke Ranch Rd over Brushy Creek
Built 2021
Bridge Details
- Structure #
- 142460137802026
- Year Built
- 1986
- Length
- 20.7 m (67.9 ft)
- Max Span
- 2.7 m
- Width
- 24.8 m (81.4 ft)
- Lanes
- 5
- Daily Traffic
- 40,741
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.