Krienke Ranch Rd over Brushy Creek
0.2 Mi NW of RM1431 · County 491, Texas · Built 2021 · 2 Lanes · 38 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.539672, -97.779203
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
FM 1431 over BRUSHY CREEK
Built 1986
RONALD REAGAN BLVD over SPANISH OAK CREEK
Built 2004
FM 734 (PARMER LN) over DRAW
Built 1994
COLONIAL PKWY over DRAW
Built 2003
SAM BASS RD over DRY FORK DRAW
Built 2002
FM 1431 WB over SPANISH OAK CREEK
Built 2018
FM 1431 EB over SPANISH OAK CREEK
Built 2018
FM 1431 over BRANCH OF HONEY BEAR
Built 1986
SAM BASS RD over DRY FORK DRAW
Built 2002
E NEW HOPE DRIVE over POST OAK CREEK
Built 2022
Bridge Details
- Structure #
- 142460Q58945001
- Year Built
- 2021
- Length
- 18.6 m (61 ft)
- Max Span
- 2.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 38
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.