FM 1431 EB over SPANISH OAK CREEK
2.1 MI E OF US 183 · County 491, Texas · Built 2018 · 2 Lanes · 21,554 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.530497, -97.796253
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
FM 1431 WB over SPANISH OAK CREEK
Built 2018
ARROW POINT DR over COTTONWOOD CREEK
Built 2003
E NEW HOPE DRIVE over POST OAK CREEK
Built 2022
Cottonwood Crk Trl over Cottonwood Creek
Built 2013
COLONIAL PKWY over DRAW
Built 2003
RONALD REAGAN BLVD over SPANISH OAK CREEK
Built 2004
FM 734 (PARMER LN) over DRAW
Built 1994
C-BAR RANCH TRAIL over SPANISH OAK CREEK
Built 2022
E PARK ST over DRAW
Built 2006
FM 1431 over BRUSHY CREEK
Built 1986
Bridge Details
- Structure #
- 142460137802432
- Year Built
- 2018
- Length
- 86.9 m (285.1 ft)
- Max Span
- 29 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 21,554
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.