C-BAR RANCH TRAIL over SPANISH OAK CREEK
0.3 MI S OF E WHITESTONE · County 491, Texas · Built 2022 · 2 Lanes · 204 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.522086, -97.810397
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
Units 47-62 over DRAW
Built 2021
183A NB FR over SPANISH OAK CR
Built 2007
183A NB ML over SPANISH OAK CR TRIB
Built 2007
183A SB FR over SPANISH OAK CR
Built 2007
US 183A SBML over SPANISH OAK CR TRIB
Built 2007
183A NB ML over FM 1431 & SPANISH OAK CK
Built 2007
183A SB ML over RM 1431 & SPANISH OAK CK
Built 2007
FM 1431 over SPANISH OAK CREEK
Built 1986
DISCOVERY BLVD over DRAW
Built 2000
PARK ST over US 183A TOLLWAY
Built 2007
Bridge Details
- Structure #
- 142460BM0739001
- Year Built
- 2022
- Length
- 19.2 m (63 ft)
- Max Span
- 19.2 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 2
- Daily Traffic
- 204
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.