DISCOVERY BLVD over DRAW
0.1 MI S OF FM 1431 · County 491, Texas · Built 2000 · 5 Lanes · 7,250 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.522808, -97.820247
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 26 years old.
Nearby Bridges
FM 1431 over SPANISH OAK CREEK
Built 1986
183A SB FR over SPANISH OAK CR
Built 2007
183A SB ML over RM 1431 & SPANISH OAK CK
Built 2007
183A NB ML over FM 1431 & SPANISH OAK CK
Built 2007
183A NB FR over SPANISH OAK CR
Built 2007
DISCOVERY BLVD over SPANISH OAK CREEK
Built 2004
183A NB ML over SPANISH OAK CR TRIB
Built 2007
US 183A SBML over SPANISH OAK CR TRIB
Built 2007
N BLUE RIDGE PKWY over DRAW
Built 2000
Units 47-62 over DRAW
Built 2021
Bridge Details
- Structure #
- 142460G01840001
- Year Built
- 2000
- Length
- 7.3 m (24 ft)
- Max Span
- 2.1 m
- Width
- 19.8 m (65 ft)
- Lanes
- 5
- Daily Traffic
- 7,250
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.