Journey Pkwy over Draw

0.05 mi W of Sam Bass Rd · County 491, Texas · Built 2013 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
142460AA0179002
Year Built
2013
Length
7.6 m (24.9 ft)
Max Span
2.1 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
4,000
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.