NORTHWEST BLVD over IH 35
1.9 MI N OF SH 29 · County 491, Texas · Built 2020 · 4 Lanes · 2,971 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.655617, -97.674903
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
Williams Drive over IH 35 ML
Built 2023
WILLIAMS DRIVE over IH 35 ML
Built 2023
COLLEGE STREET over SAN GABRIEL RIVER
Built 2010
RIVERY BLVD over N FORK SAN GABRIEL
Built 2003
AUSTIN AVENUE over NORTH SAN GABRIEL RIVER
Built 1940
IH 35 SBFR over N SAN GABRIEL RIVER
Built 1988
IH 35 SB over NORTH SAN GABRIEL RIVER
Built 1965
Shady Hollow Drive over Pecan Branch
Built 1962
IH 35 NB over NORTH SAN GABRIEL RIVER
Built 1965
IH 35 NBFR over N SAN GABRIEL RIVER
Built 1997
Bridge Details
- Structure #
- 142460001508748
- Year Built
- 2020
- Length
- 135.6 m (444.9 ft)
- Max Span
- 39.6 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 4
- Daily Traffic
- 2,971
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.