IH 35 NBFR over N SAN GABRIEL RIVER

0.2 MI S OF FM 2338 · County 491, Texas · Built 1997 · 3 Lanes · 24,951 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
142460001508441
Year Built
1997
Length
257.6 m (845.1 ft)
Max Span
39.6 m
Width
15.9 m (52.2 ft)
Lanes
3
Daily Traffic
24,951
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.