IH 35 NB over NORTH SAN GABRIEL RIVER

0.2 MI S OF FM 2338 · County 491, Texas · Built 1965 · 3 Lanes · 9,323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
142460001508243
Year Built
1965
Reconstructed
2001
Length
266.7 m (875 ft)
Max Span
19.8 m
Width
17.6 m (57.7 ft)
Lanes
3
Daily Traffic
9,323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.