IH 35 SBFR over N SAN GABRIEL RIVER
0.2 MI S OF FM 2338 · County 491, Texas · Built 1988 · 4 Lanes · 23,955 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.646447, -97.683822
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 38 years old.
Nearby Bridges
IH 35 SB over NORTH SAN GABRIEL RIVER
Built 1965
IH 35 NB over NORTH SAN GABRIEL RIVER
Built 1965
IH 35 NBFR over N SAN GABRIEL RIVER
Built 1997
AUSTIN AVENUE over NORTH SAN GABRIEL RIVER
Built 1940
WILLIAMS DRIVE over IH 35 ML
Built 2023
Williams Drive over IH 35 ML
Built 2023
AUSTIN AVENUE over SOUTH SAN GABRIEL RIVER
Built 1940
RIVERY BLVD over N FORK SAN GABRIEL
Built 2003
NORTHWEST BLVD over IH 35
Built 2020
COUNTRY CLUB RD over NORTH SAN GABRIEL RIVER
Built 1960
Bridge Details
- Structure #
- 142460001508412
- Year Built
- 1988
- Reconstructed
- 2021
- Length
- 310.9 m (1020 ft)
- Max Span
- 19.8 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 4
- Daily Traffic
- 23,955
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $71,000
- Total Project Cost
- $89,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.