OLD COACH RD over LAKE APACHE SPILLWAY
0.1 MI NW OF STAGECOACH · County 339, Texas · Built 1963 · 2 Lanes · 400 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
30.142778, -95.710767
This bridge is in worse condition than 97.7% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
Old Coach Road over Lake Apache
Built 2023
STAGECOACH RD over LAKE HARDIN BRANCH
Built 2011
WALNUT CREEK RD over SULPHUR BRANCH
Built 1996
WALNUT CREEK RD over WALNUT CREEK
Built 1987
SILVER SPUR over WALNUT CREEK
Built 2011
POST OAK RUN over SULFUR BRANCH
Built 2000
TURKEY SHOOT RD over DECKER BRANCH
Built 1986
MEADOW WOOD GREEN over DAVIS BRANCH
Built 2000
DECKER P ROSEHILL over WALNUT CREEK
Built 1985
NICHOLS SAWMILL RD over WALNUT CREEK
Built 1985
Bridge Details
- Structure #
- 121700N00040010
- Year Built
- 1963
- Length
- 9.1 m (29.9 ft)
- Max Span
- 2.7 m
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.