WALNUT CREEK RD over SULPHUR BRANCH
0.06 MI W OF STAGECOACH · County 339, Texas · Built 1996 · 2 Lanes · 1,430 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
30.1401, -95.710992
This bridge is in worse condition than 78.1% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 30 years old.
Nearby Bridges
STAGECOACH RD over LAKE HARDIN BRANCH
Built 2011
OLD COACH RD over LAKE APACHE SPILLWAY
Built 1963
Old Coach Road over Lake Apache
Built 2023
WALNUT CREEK RD over WALNUT CREEK
Built 1987
SILVER SPUR over WALNUT CREEK
Built 2011
POST OAK RUN over SULFUR BRANCH
Built 2000
DECKER P ROSEHILL over WALNUT CREEK
Built 1985
TURKEY SHOOT RD over DECKER BRANCH
Built 1986
MEADOW WOOD GREEN over DAVIS BRANCH
Built 2000
NICHOLS SAWMILL RD over WALNUT CREEK
Built 1985
Bridge Details
- Structure #
- 121700AA1011001
- Year Built
- 1996
- Length
- 16.8 m (55.1 ft)
- Max Span
- 16.8 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,430
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.