STAGECOACH RD over LAKE HARDIN BRANCH
0.05 MI N OF WALNUT CK RD · County 339, Texas · Built 2011 · 2 Lanes · 838 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.140475, -95.710008
This bridge is in worse condition than 37.3% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 15 years old.
Nearby Bridges
WALNUT CREEK RD over SULPHUR BRANCH
Built 1996
OLD COACH RD over LAKE APACHE SPILLWAY
Built 1963
Old Coach Road over Lake Apache
Built 2023
WALNUT CREEK RD over WALNUT CREEK
Built 1987
SILVER SPUR over WALNUT CREEK
Built 2011
POST OAK RUN over SULFUR BRANCH
Built 2000
TURKEY SHOOT RD over DECKER BRANCH
Built 1986
DECKER P ROSEHILL over WALNUT CREEK
Built 1985
MEADOW WOOD GREEN over DAVIS BRANCH
Built 2000
NICHOLS SAWMILL RD over WALNUT CREEK
Built 1985
Bridge Details
- Structure #
- 121700AA0919001
- Year Built
- 2011
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.3 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 838
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.