MASTERS ST over CHOCOLATE BAYOU
2.40 MI SW OF SH 6 · County 039, Texas · Built 2011 · 2 Lanes · 1,830 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.439375, -95.37545
This bridge is in worse condition than 69.8% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 15 years old.
Nearby Bridges
MERIDIANA PKWY SB over W FORK CHOCOLATE BAYOU
Built 2021
MERIDIANA PKWY NB over W FORK CHOCOLATE BAYOU
Built 2021
MASTERS ST over DRAINAGE DITCH
Built 2015
CR 451A over DRAINAGE DITCH
Built 1980
MERIDIANA PKWY NB over BRISCOE CANAL
Built 2021
MERIDIANA PKWY SB over BRISCOE CANAL
Built 2021
CLARK RD over CHOCOLATE BAYOU
Built 2011
CLARK RD over BRAZOS RIV AUTH CANAL
Built 1990
MERIDIANA PKWY WB over W FORK CHOCOLATE BAYOU
Built 2021
MERIDIANA PKWY EB over W FORK CHOCOLATE BAYOU
Built 2021
Bridge Details
- Structure #
- 120200W00095002
- Year Built
- 2011
- Length
- 15.2 m (49.9 ft)
- Max Span
- 15.2 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,830
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.